Less room for delivering and assembling modules: the kind of challenge we like. Especially as it came with another – a matter of structural engineering. We had to install a ceiling-mounted device – an Allura from Philips – in the future hybrid operating theatre. That meant we had to take the device into account in planning and include a heavy-duty ceiling. The high-quality stainless-steel walls also built in made the project even more special.
Herbert Dörnberger, Managing Director Cadolto Switzerland“We won the customer because we had the best partners with the best value for money.”
Despite the spatial constraints and difficult conditions around the build, we constructed a hybrid operating theatre and a plant control room with all our usual professionalism and speed at the site in Lugano. In roughly three and a half months, we used our solutions to create 114 m² of additional space distributed over four modules and two floors.