Ospedale Regionale di Lugano, Switzerland

A high-precision extension.

Gross floor space
(sq. m)
114
Construction time
3
6
Modular construction
Conventional
construction
Module count
4
Building
Ward units
Operating theatres
Functional units
Diagnosis rooms

“We won the customer because we had the best partners with the best value for money.”

Herbert Dörnberger, Managing Director Cadolto Switzerland

Less room for delivering and assembling modules: the kind of challenge we like. Especially as it came with another – a matter of structural engineering. We had to install a ceiling-mounted device – an Allura from Philips – in the future hybrid operating theatre. That meant we had to take the device into account in planning and include a heavy-duty ceiling. The high-quality stainless-steel walls also built in made the project even more special.

Despite the spatial constraints and difficult conditions around the build, we constructed a hybrid operating theatre and a plant control room with all our usual professionalism and speed at the site in Lugano. In roughly three and a half months, we used our solutions to create 114 m² of additional space distributed over four modules and two floors.